000 00515nam a2200157 4500
005 20250804052531.0
082 _bMUJ
100 _aMujhaid Ali.
245 _aOptimizing effective well length and horizontal well productivity (simulation) /
_cMujhaid Ali.
260 _aMUET, Jamshoro :
_bInstitute of Petroleum & Natural Gas Engineering,
_c2017.
300 _axiii, 82p. :
_bill. ; 30 cm.
504 _aIncludes References.
650 _aPetroleum Engineering.
700 _aMemon, Khalil-Reham.
942 _cTHESES
999 _c25528
_d25528