| 000 | 00565nam a2200157 4500 | ||
|---|---|---|---|
| 005 | 20250919060252.0 | ||
| 082 | _bMUH | ||
| 100 | _aMuhammad Jamal | ||
| 245 |
_aMinimizing six big losses by total productive maintenance (TPM) at Al Rahim textile industries, Nooriabad / _cMuhammad Jamal, Muhammad Musab Shahjee & Ali Raza. |
||
| 260 |
_aMUET, Jamshoro : _bIndustrial Engineering, _c2022. |
||
| 300 |
_a65p. : _bill. ; 30 cm. |
||
| 504 | _aIncludes References. | ||
| 650 | _aIndustrial Engineering & Management. | ||
| 700 | _aMemon, Muhammad Saad. | ||
| 942 | _cTHESES | ||
| 999 |
_c26355 _d26355 |
||