000 00565nam a2200157 4500
005 20250919060252.0
082 _bMUH
100 _aMuhammad Jamal
245 _aMinimizing six big losses by total productive maintenance (TPM) at Al Rahim textile industries, Nooriabad /
_cMuhammad Jamal, Muhammad Musab Shahjee & Ali Raza.
260 _aMUET, Jamshoro :
_bIndustrial Engineering,
_c2022.
300 _a65p. :
_bill. ; 30 cm.
504 _aIncludes References.
650 _aIndustrial Engineering & Management.
700 _aMemon, Muhammad Saad.
942 _cTHESES
999 _c26355
_d26355