| 000 | 00535nam a2200157 4500 | ||
|---|---|---|---|
| 005 | 20260101072655.0 | ||
| 082 | _aZUN | ||
| 100 | _aZunair Aziz. | ||
| 245 |
_aAnalyzing assembly lines production flow using arena simulation a case study at raazy motors Hyderabad Pakistan / _cZunair Aziz...[et.al.] |
||
| 260 |
_aMUET, Jamshoro : _bIndustrial Engineering, _c2020. |
||
| 300 |
_avi, 60p. : _bill. ; 30 cm. |
||
| 504 | _aIncludes References. | ||
| 650 | _aIndustrial Engineering. | ||
| 700 | _aSoomro, Abdul Salam. | ||
| 942 | _cTHESES | ||
| 999 |
_c52908 _d52908 |
||