| 000 | 00556nam a2200157 4500 | ||
|---|---|---|---|
| 005 | 20260120063825.0 | ||
| 082 | _aBAS | ||
| 100 | _aBasit Ali. | ||
| 245 |
_aOptimization of productivity by lean practices & sam at home textile unit : _ba case study at yunus textile mills unit-3 / _cBasit Ali, M. Younis & Aijaz Ahmed. |
||
| 260 |
_aMUET, Jamshoro : _bIndustrial Engineering, _c2025. |
||
| 300 |
_axiii, 69p. : _bill. ; 30 cm. |
||
| 504 | _a Includes References. | ||
| 650 | _a Industrial Engineering. | ||
| 700 | _aKhan, Muhammad Ali. | ||
| 942 | _cTHESES | ||
| 999 |
_c53053 _d53053 |
||